Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
科润电力
Crown-cash-billing@meili25.com
博彩平台
在线赌博平台
搜房网兰州租房网
华声新闻
汽车大世界汽车报价大全
百信银行
皇冠体育博彩
Sports-betting-help@hunan263.com
Venice-Macao-info@car-rentalturkey.com
PPTV电影频道
365-Sports-Betting-marketing@vko29.com
Sun-City-app-contactus@iconfuture.net
Wynn-Sports-marketing@810zc.com
Venetian-Online-billing@692887.com
Sport-Venetian-help@tccestates.com
线上博彩网址
博彩网站
成都奥数网
济宁银行
旅游族
长安大学就业信息网
券妈妈
山西卫生信息网
来疯论坛
三门峡生活网
中国临海人才网
方兴实业
海尔社区
涨姿势
北京卫生信息网
成都新东方培训学校
178动画网
中创物流股份有限公司